Cinemark Riverton
Construction
Looking across the parking lot at the front of the theater.  An unfinished two-tier tower stands over the entrance. - , Utah
Looking across the parking lot at the front of the theater.  An unfinished two-tier tower stands over the entrance.
Grant Smith
25 December 2021
The back side of the theater, seen across Majestic Rise Parkway. - , Utah
The back side of the theater, seen across Majestic Rise Parkway.
Grant Smith
25 December 2021
The north wall of the theater, with the sun in the background. - , Utah
The north wall of the theater, with the sun in the background.
Grant Smith
25 December 2021
The north exterior wall, with a temporary stairway to the roof on the left side. - , Utah
The north exterior wall, with a temporary stairway to the roof on the left side.
Grant Smith
25 December 2021
The northwest corner of the building.  A plywood wall blocks access to temporary stairs to the roof. - , Utah
The northwest corner of the building.  A plywood wall blocks access to temporary stairs to the roof.
Grant Smith
25 December 2021
Scaffolding and stairs at the north end of the east exterior wall. - , Utah
Scaffolding and stairs at the north end of the east exterior wall.
Grant Smith
25 December 2021
North end of the east exterior wall. - , Utah
North end of the east exterior wall.
Grant Smith
25 December 2021
Temporary supports hold up a section of concrete wall which may hide exterior stairs from the upper floor. - , Utah
Temporary supports hold up a section of concrete wall which may hide exterior stairs from the upper floor.
Grant Smith
25 December 2021
Looking across the back parking lot toward the theater complex. - , Utah
Looking across the back parking lot toward the theater complex.
Grant Smith
25 December 2021
A three-story building rises on the south side of the theater. - , Utah
A three-story building rises on the south side of the theater.
Grant Smith
25 December 2021
The east exterior wall, seen from the sidewalk. - , Utah
The east exterior wall, seen from the sidewalk.
Grant Smith
25 December 2021
Insulation covers recently poured curbing on the east side of the multiplex. - , Utah
Insulation covers recently poured curbing on the east side of the multiplex.
Grant Smith
25 December 2021
Foam blocks stacked on the east side fo the theater. - , Utah
Foam blocks stacked on the east side fo the theater.
Grant Smith
25 December 2021