Menu
Cinemark Riverton
Construction
Looking across the parking lot at retail storefronts along the west side of the theater. - , Utah
Looking across the parking lot at retail storefronts along the west side of the theater.
Grant Smith
25 December 2021
The back side of the theater, seen across Majestic Rise Parkway. - , Utah
The back side of the theater, seen across Majestic Rise Parkway.
Grant Smith
25 December 2021
The north wall of the theater, with the sun in the background. - , Utah
The north wall of the theater, with the sun in the background.
Grant Smith
25 December 2021
The north exterior wall, with a temporary stairway to the roof on the left side. - , Utah
The north exterior wall, with a temporary stairway to the roof on the left side.
Grant Smith
25 December 2021
The northwest corner of the building.  A plywood wall blocks access to temporary stairs to the roof. - , Utah
The northwest corner of the building.  A plywood wall blocks access to temporary stairs to the roof.
Grant Smith
25 December 2021
Scaffolding and stairs at the north end of the east exterior wall. - , Utah
Scaffolding and stairs at the north end of the east exterior wall.
Grant Smith
25 December 2021
North end of the east exterior wall. - , Utah
North end of the east exterior wall.
Grant Smith
25 December 2021
Temporary supports hold up a section of concrete wall which may hide exterior stairs from the upper floor. - , Utah
Temporary supports hold up a section of concrete wall which may hide exterior stairs from the upper floor.
Grant Smith
25 December 2021
Looking across the back parking lot toward the theater complex. - , Utah
Looking across the back parking lot toward the theater complex.
Grant Smith
25 December 2021
A three-story building rises on the south side of the theater. - , Utah
A three-story building rises on the south side of the theater.
Grant Smith
25 December 2021
The east exterior wall, seen from the sidewalk. - , Utah
The east exterior wall, seen from the sidewalk.
Grant Smith
25 December 2021
Insulation covers recently poured curbing on the east side of the multiplex. - , Utah
Insulation covers recently poured curbing on the east side of the multiplex.
Grant Smith
25 December 2021
Foam blocks stacked on the east side fo the theater. - , Utah
Foam blocks stacked on the east side fo the theater.
Grant Smith
25 December 2021