Construction - April 2011
A Road Closed sign by U. S. Development Inc., by the southeast corner of the theater. - , Utah
A Road Closed sign by U. S. Development Inc., by the southeast corner of the theater.
Grant Smith
2 April 2011
A crane rises behind the existing building, as a new auditorium takes shape along the side. - , Utah
A crane rises behind the existing building, as a new auditorium takes shape along the side.
Grant Smith
2 April 2011
A new auditorium is being added along the north side of the existing  building. - , Utah
A new auditorium is being added along the north side of the existing  building.
Grant Smith
2 April 2011
A crane above the rising walls of two auditoriums at the northwest corner of the existing building. - , Utah
A crane above the rising walls of two auditoriums at the northwest corner of the existing building.
Grant Smith
2 April 2011
A new auditorium along the north side of the existing building. - , Utah
A new auditorium along the north side of the existing building.
Grant Smith
2 April 2011
Scaffolding surrounds a new auditorium as its walls begin to rise. - , Utah
Scaffolding surrounds a new auditorium as its walls begin to rise.
Grant Smith
2 April 2011
Scaffolding lines a new hallway running along the back of the existing building. - , Utah
Scaffolding lines a new hallway running along the back of the existing building.
Grant Smith
2 April 2011
Looking towards the crane and scaffolding. - , Utah
Looking towards the crane and scaffolding.
Grant Smith
2 April 2011
Looking west, along the north wall of the new building. - , Utah
Looking west, along the north wall of the new building.
Grant Smith
2 April 2011
An auditorium exit door is framed into a rising wall. - , Utah
An auditorium exit door is framed into a rising wall.
Grant Smith
2 April 2011
The northwest corner of the new building, with a possible exit hall in the upper left. - , Utah
The northwest corner of the new building, with a possible exit hall in the upper left.
Grant Smith
2 April 2011
A wall prepared for the pouring of concrete. - , Utah
A wall prepared for the pouring of concrete.
Grant Smith
2 April 2011
Looking across one of the two largest auditoriums. - , Utah
Looking across one of the two largest auditoriums.
Grant Smith
2 April 2011
Poles help hold up the framing for a wall before the concrete is poured. - , Utah
Poles help hold up the framing for a wall before the concrete is poured.
Grant Smith
2 April 2011
The foundation for the second of the two largest auditoriums. - , Utah
The foundation for the second of the two largest auditoriums.
Grant Smith
2 April 2011
The foundation for a smaller auditorium, at the very southwest corner of the new building. - , Utah
The foundation for a smaller auditorium, at the very southwest corner of the new building.
Grant Smith
2 April 2011
The foundation along the south side, looking north. - , Utah
The foundation along the south side, looking north.
Grant Smith
2 April 2011
Four square foundations, possibly supports for the stadium seating section of one of the larger auditoriums. - , Utah
Four square foundations, possibly supports for the stadium seating section of one of the larger auditoriums.
Grant Smith
2 April 2011
A hallway running north. - , Utah
A hallway running north.
Grant Smith
2 April 2011
The crane. - , Utah
The crane.
Grant Smith
2 April 2011
Asphalt pavement from the parking lot remains inside one of the new auditoriums. - , Utah
Asphalt pavement from the parking lot remains inside one of the new auditoriums.
Grant Smith
2 April 2011
The west exterior wall of the original building. - , Utah
The west exterior wall of the original building.
Grant Smith
2 April 2011
The exterior stairs have been removed from the original building's three exit doors.  Above are two doors opening into the projection room. - , Utah
The exterior stairs have been removed from the original building's three exit doors.  Above are two doors opening into the projection room.
Grant Smith
2 April 2011
Looking across the west exterior wall of the existing building at the scaffolding for a next exit hall to the north. - , Utah
Looking across the west exterior wall of the existing building at the scaffolding for a next exit hall to the north.
Grant Smith
2 April 2011
Looking across the construction site from the exterior stairs at the southwest corner of the existing building. - , Utah
Looking across the construction site from the exterior stairs at the southwest corner of the existing building.
Grant Smith
2 April 2011
A trench for utilities along the south side of the original building. - , Utah
A trench for utilities along the south side of the original building.
Grant Smith
2 April 2011